Ship Information · SSN-750

The boat, in reference

The third U.S. Navy ship named for the city — a Los Angeles-class attack submarine built in the same yard as the cruiser whose name she took. This page keeps her facts compact; her full story is told on The Submarine.

Identity

The Navy awarded her contract on 19 April 1982 to Newport News Shipbuilding and Dry Dock Company. Her keel was laid 3 March 1984; she was launched on 15 March 1986, sponsored by Mrs. Rosemary D. Trible; and she commissioned on 3 June 1989 at Naval Station Norfolk. An improved Los Angeles-class boat — the "688i" flight — she carried twelve vertical launch tubes for Tomahawk missiles fitted forward of her sail.

Her insignia, as the committee's original page described it, was an ellipse echoing the shipyard's own mark, bearing the Victory Arch and stars for the two earlier ships named Newport News. Her motto was chosen for the name: Magni Nominis Umbra, "under the shadow of a great name."

Facts

NamesakeCity of Newport News, Virginia — the third U.S. Navy ship of the name
ClassLos Angeles-class (688i flight) nuclear-powered attack submarine
BuilderNewport News Shipbuilding & Dry Dock Company, Newport News, Virginia
Contract awarded19 April 1982
Laid down3 March 1984
Launched15 March 1986; sponsor Mrs. Rosemary D. Trible
Commissioned3 June 1989, Naval Station Norfolk
Inactivated31 January 2026, Naval Station Norfolk
MottoMagni Nominis Umbra — "under the shadow of a great name"
Length362 feet
Beam33 feet
DisplacementAbout 6,000 tons surfaced / 6,900 submerged
PropulsionOne S6G nuclear reactor; one shaft
ArmamentFour 21-inch torpedo tubes; twelve vertical-launch tubes for Tomahawk cruise missiles
ComplementAbout 130 officers and enlisted
HomeportsNorfolk, Virginia (1989–2022); Groton, Connecticut (2023–2026); Norfolk again for her final week
StatusInactivated; bound for Puget Sound Naval Shipyard recycling — as of 2026

Status, as of 2026

She returned to Naval Station Norfolk on 23 January 2026 and was inactivated there on 31 January — announced by NAVADMIN 034/26 — bound for Puget Sound Naval Shipyard to be defueled and recycled under the Navy's Ship-Submarine Recycling Program.

Related pages

The Submarine tells the full story — her crews, the Mogamigawa night, the homecomings, and the citizens' committee that stood behind her. That committee's own history is on the Liaison Committee page.

Keel, launch, and commissioning dates and builder confirmed against the Naval Vessel Register's SSN-750 entry; sponsor and commissioning detail per NavSource Naval History's SSN-750 captions; motto per the U.S. Naval Institute's motto survey (Proceedings, February 2020) and Virginia Senate Joint Resolution 447 (2009); status per NAVADMIN 034/26 as reported by Seapower and USNI News. Dimensions and armament per standard public references. Full narrative and source list: The Submarine and About & Sources.